Huntington Drive Logo

The Eastern Avenue Project Team is preparing for the next community meeting. Find details below. Be sure to tell your friends and neighbors.

Announcement

  • Join us for an in-person public open house to learn about the selected artist and to review the planned conceptual design.

Thursday, August 6, 2026 | 6:00 – 8:00 p.m.

El Sereno Senior Citizen Center | 4818 Klamath Place, Los Angeles, CA 90032

We’re excited to be back and hope to see you there!

Project Overview

Eastern Avenue is a centrally located and highly used street with treasured El Sereno institutions. The Eastern Avenue Multi-Modal Transportation Improvement Project will transform and improve Eastern Avenue by building upon the Envision Eastern project to improve safety for pedestrians, bicyclists, transit riders, and drivers, increasing accessibility to El Sereno institutions for families.

The City of Los Angeles Bureau of Engineering, in partnership with Councilmember Ysabel Jurado (Council District 14), will provide infrastructure improvements including street improvements to increase safety and mobility, pedestrian and bike facilities, transit accessibility improvements, and other traffic safety enhancements to improve the connectivity of the surrounding residential areas to the community parks, schools, and small businesses that bring life to Eastern Avenue.

Mobility Improvement Concepts

  • Incorporate Vision Zero features to increase safe, healthy, equitable mobility for all
  • Improve walkability and accessibility features throughout the corridor
  • Implementation of a bike network
  • Manage on-street parking

Environmental Clearance

The Eastern Avenue Multimodal Transportation Improvement project is one of many projects funded by the 710 N Freeway Mobility Improvement program. As part of the overall final Environmental process, LA Metro’s Board selected the Transportation System Management / Transportation Demand Management (TSM/TDM) as the preferred alternative. Selection of this alternative allowed for multiple, local projects, including Eastern Avenue. The following link provides access to the final environmental documents of the State Route (SR-)710 North Mobility Improvement program: https://www.metro.net/projects/sr-710-mobility-improvements.

Anticipated Approximate Timeline

Final Approvals and Contractor Bidding in 2026, followed by the start of Construction in 2027.

Artist’s Vision

Meet Andrea Ramirez, better known as “Mextica”. Mextica is an El Sereno-based artist, curator, and community advocate whose work centers on local storytelling and cultural identity. She brings a unique vision to the Eastern Avenue Multimodal Transportation Improvement project with her deep ties to the neighborhood and her ability to translate community history into meaningful public art that reflects the voices and character of the corridor.

Study Corridor

Click on map below for larger view.

Eastern Ave Corridor Map

Project Elements for Community Input

Click below to see project design elements included in the survey.

Eastern Ave Corridor Map

Project Resources

Below are documents and links related to the project.

Interactive Map

The Eastern Avenue Multi-Modal Transportation Improvement Project is a 1.5-mile-long neighborhood corridor connecting the critical transit corridors of Huntington Drive and Valley Boulevard. Eastern Avenue is a heavily trafficked, two-lane north-bound and south-bound roadway that serves residential, commercial, institutional, and recreational land uses.